LOGIN | REGISTER

Page 2 of 2 FirstFirst 12
Results 11 to 12 of 12
  1. T-rax. Not cheap but steel easy assembly and never failed.

  2. #12
    I did mine like Speeleft but started them higher up. I used 3/4" wood dowels, then slid metal pipes from closets over the dowels for strength. Then pipe insulation, cost about $20 total.

    They hold 4 boards and I have a full fridge under them and to the right is shelving that holds everything in rubbermaid buckets for the wetsuits and other gear.

    Biggest cost was the containers. But it is cool to grab and go, then toss the wet suits back in the tub for rinsing, blah blah we all have our rituals...