I'd like to think they're done now so nature can get back to work uncovering the jetty and re-forming the bars: Day 2 Day 3
tired of people crying about the pumping, guess what?? there are many other places to surf if you had this place dialed in. Ps your pic was taking at almost high tide, when it is knee high and that high of a tide, its going to be shore break.
hahaha cam screen shots. we get it homie. this is my front yard come check out all the big machines they are really cool
They did publicly state they would be working "24-7" http://www.dredgingtoday.com/2010/11/26/ocean-city’s-beach-replenishment-project-under-way-usa/
Poles Couldn't really say if they were Polish or not, but it seems as though it's two days, and move, two days and move. Currently @ 44th and moving south to about 27th I believe. Then it's Delaware's turn.
I believe they already did the first few blocks in fenwick. But really it been a looooooooong time since fenwick has been rideable, beside the state line.
pilings gone It looks like the ACE buried the pilings along with the groin last night. That's a lot of ocean bottom pumped up on the beach! Hope it washes up somewhere else to make a nice break.
I remember when they were pumping up here in monmouth county about 10 years ago. That pipe was pumping that slew out onto the beach and i fell in a pool of this water, deep sand mix. Our beach was nasty for the first two years or so.